This project involved the installation of a new 3-phase transformer pad and two new power units, each designed to supply power to its own user station. Each unit can charge at 400 amps simultaneously from both charging ports. Additionally, these power units can support an extra user station and allow for the expansion of the existing system with more power units, each capable of accommodating up to two user stations. We assisted the customer with the commissioning of the units, which included testing several points within the factory equipment.